FERNDALE NEWS | LOCAL PUBLIC-INTEREST REPORTING · 2026
A major transportation question for Ferndale entered a new formal stage in 2026: Caltrans began environmental review for a project intended to secure reliable long-term access to town across the Eel River and its floodplain. The Ferndale Access Project focuses on deficiencies at Fernbridge, the State Route 211 crossing that connects Ferndale to the wider highway network.
The core of the access problem
Fernbridge and State Route 211 provide a critical connection for residents, schools, freight, visitors and emergency travel. Floods, seismic concerns and aging infrastructure have raised questions about how reliable the route will remain. Caltrans says the project's goal is to address deficiencies and ensure permanent access rather than simply apply a short-term pavement treatment.
What happened in early 2026
Caltrans District 1 filed a Notice of Preparation for a draft Environmental Impact Report on February 24, 2026, with a public review period from February 27 to April 17. The state lists potential impact areas including transportation, agriculture, the river and wetlands, flooding, biological resources, historic features and public services. The project review covers alternatives rather than a single fully built replacement design.
Why crews studied the bridge foundations
A separate May 27, 2026 filing describes geotechnical investigation for the Ferndale Access Project. The agency proposed seven drilling locations: five soil borings—two on the river bar and three on upland areas—and two upland piezometers, with investigations possibly as deep as 300 feet. These data help engineers assess alternatives for repairing or rehabilitating Fernbridge.
What residents can do next
Public review of the Notice of Preparation is complete, but the full environmental process can include later draft EIR circulation and other comment opportunities. Residents can ask Caltrans how travel will be maintained, what alternative designs are under consideration, and how floodplain effects are evaluated. Ferndale News will distinguish preliminary fieldwork and environmental review from an actual approved construction schedule.
Official sources and records
Support Ferndale News
Choose how to support Ferndale News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Ferndale News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Ferndale News
- Ferndale’s Victorian Streets Are Only Half the Story: Local Video Tours and the Centerville Coast Debate →
- Ferndale Man Sentenced to 10 Years for Attempting to Lure a Minor Online →
- Humboldt County Abandons $3.8 Million Centerville Road Repair as Coastal Cliffs Erode →
- Ferndale Fire Measure F: Yes at 69.38% in November 5 Report →
- Ferndale Council: Fisk-Becker and Chase Lead; School Bond Yes at 54.73% →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.